Water Treatment Plant

Project Outline

  • Year: 2019-Present
  • Location: Fiji Island - Rewa River
  • Overall Cost: USD $4.4B
  • Client: Water Authority of Fiji (WAF)
  • Positions Held: Client Representative and Design Reviewer (Electrical, Instrumentation and Control Systems)

Main Project Features

  • Water Treatment Plant for 80 Million Litres Per Day
  • Green Field Installation on the Rewa River supplying water to the city of Suva.
  • Please Supply
Water Treatment Plant

Activities Performed

    • Client Representative for Electrical, Instrumentation and Control Systems.
    • Technical liaison between Water Authority and the D&C Contractor.
    • Design verification services.
    • HAZOP Meetings for the project.
    • Site construction supervision and auditing.